我看字典>英语词典>subcontracted翻译和用法

subcontracted

英 [ˌsʌbkənˈtræktɪd]

美 [ˌsʌbˈkɑːntræktɪd]

v.  分包; 转包
subcontract的过去分词和过去式

过去式:subcontracted 

柯林斯词典

    The verb is pronounced /ˌsʌbkən'trækt/. The noun is pronounced /sʌb'kɒntrækt/. 动词读作 /ˌsʌbkən'trækt/,名词读作 /sʌb'kɒntrækt/。

  • VERB 将…分包;将…转包
    If one firmsubcontractspart of its worktoanother firm, it pays the other firm to do part of the work that it has been employed to do.
    1. The company is subcontracting production of most of the parts...
      该公司外包了大部分零部件的生产。
    2. They are cutting costs by subcontracting work out to other local firms.
      他们通过将任务转包给当地其他公司来减少成本。
  • 分包合同;转包契约
    Asubcontractis a contract between a firm which is being employed to do a job and another firm which agrees to do part of that job.

    双语例句

    • Contents and scope of subcontracted work;
      分包工程的内容和范围。
    • Most of the bricklaying has been subcontracted to a local builder.
      大部分砌砖工作转包给一名当地的建筑商。
    • The electrical work have been subcontracted to smith ltd.
      电气工作已转包给史密斯有限公司。
    • The electrical work has been subcontracted to Smith Ltd..
      电工工作已转承包给史密斯有限公司。
    • This paper provides a quite scientific thought and method for the supplier quality assurance capability assessment in China's subcontracted program, which will be helpful to realize the goals of "High-quality, short time to market, and Low-cost" in commercial aircraft production.
      波音预测未来商务飞机和航空服务市场本文为我国转包生产项目供应商质量保证能力的评定提供了比较科学的思路与方法,为实现民机项目优质、准时、低成本的生产目标打下了基础。
    • The toy was produced by Early Light Industrial, one of Mattel's contract manufacturing facilities in China, which subcontracted the painting of parts of the toy to another company.
      这些玩具汽车是由旭日实业有限公司(EarlyLightIndustrial)生产的。旭日实业是美泰在中国的合同制造企业之一,它又将玩具零部件的涂漆工作转包给了另一家企业。
    • The design task is subcontracted to or privately consigned to designers of other design organizations;
      将设计任务转包或私拉其他机构设计人员完成的设计方案;
    • They had subcontracted some of the work to an electrician.
      他们已将某些工程分包给一个电工。
    • The car parts are designed here but are subcontracted to another manufacturer to be produced.
      这里设计的汽车零件转包给另一制造商生产。
    • The overall contractors and subcontractors shall bear joint responsibilities to project owners for the subcontracted projects.
      总承包单位和分包单位就分包工程对建设单位承担连带责任。